{"id":244,"date":"2015-01-12T09:32:59","date_gmt":"2015-01-12T09:32:59","guid":{"rendered":"http:\/\/www.missionskreis.at\/?page_id=244"},"modified":"2015-06-27T14:14:35","modified_gmt":"2015-06-27T14:14:35","slug":"water-for-school","status":"publish","type":"page","link":"https:\/\/www.missionskreis.at\/?page_id=244","title":{"rendered":"Water for School"},"content":{"rendered":"<p align=\"center\"><strong>Water Supply for St. Anne&#8217;s Senior High School<br \/>\n<a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/schule1.jpg\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-1105\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/schule1-300x201.jpg\" alt=\"schule1\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/schule1-300x201.jpg 300w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/schule1.jpg 512w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><br \/>\n<\/strong><\/p>\n<p align=\"left\">This project\u00a0was funded in part by the Austrian &#8222;Dreik\u00f6nigsAktion&#8220; and the township of Kuchl, Austria.<\/p>\n<p align=\"left\">In 2003, the diocese opened the girls&#8216; school &#8222;St. Anne&#8217;s Senior High School&#8220;. Girls and young women receive an education in order to qualify for university admission and professional training as lawyers, teachers, or social workers. At this time, approx. 210 girls attend the school. This number should increase to 450 after building expansion plans have been realised.<\/p>\n<p align=\"left\">A large problem for the school\u00a0was the water supply. Previously, the water\u00a0was brought with a tanker truck. This method was very expensive and the water quality suffered from it, as the water\u00a0was stored for a long period of time in plastic containers. About 1.6 km away from the school is a well with a manual pump. The girls\u00a0were able to\u00a0get drinking water from this distant location. On the weekends they\u00a0went to this well area to wash their clothes; however, there\u00a0was always\u00a0the\u00a0threat of being sexually assaulted by men.<\/p>\n<p align=\"left\">Attempts to find water in the immediate vicinity of the school were unsuccessful. Based on our advice, land in the area of the well was purchased in order to drill\u00a0a second\u00a0well (bore hole). Pumping water away from the original well would have caused problems for the nearby villagers who count on their water supply from this site.<\/p>\n<p align=\"left\">The second bore hole was drilled and at a depth of 70m good quality drinking water was found. From this well, water can be pumped at the rate of 50 liters per minute.<\/p>\n<p align=\"left\"><strong><span style=\"text-decoration: underline;\">Project Details<\/span>:<\/strong><\/p>\n<p align=\"left\">Coordination and Management:\u00a0Missionskreis Kuchl, Hermann Putz<br \/>\nTechnical\u00a0Planning:\u00a0\u00a0Ing. Josef Pichler<br \/>\nInstallation of Electrical Components and Water Pumps:\u00a0Ing. Josef Pichler, Ing.\u00a0Johann\u00a0Lienbacher, Ing. Joseph Addae<br \/>\nInstallation of Water Line:\u00a0\u00a0Emanuel Folli (Electrician) and Francis Langa (Water Expert, Diocese of\u00a0Damongo)<br \/>\nConstruction Contractor:\u00a0\u00a0\u00a0Emmanuel Bille<br \/>\nWell Depth\u00a0:\u00a0\u00a0\u00a070m<br \/>\nDistance to School:\u00a0\u00a0\u00a01.6km + approx. 40m from pumping depth<br \/>\nWater Pump Type:\u00a0\u00a0\u00a0\u00a0\u00a0(2)\u00a0one-phase Grundfos pumps<br \/>\nPump Capacity at \u00a070m pumping depth:\u00a0\u00a0\u00a030 l\/min. = 1800 l\/hr.<\/p>\n<p align=\"left\"><strong><span style=\"text-decoration: underline;\">Preliminary Work\u00a0\u00a0June 2009\u00a0&#8211; February 2010<\/span>:<\/strong><\/p>\n<p align=\"left\">Drilling of the new bore hole<br \/>\nInstallation of the water pipe line<br \/>\nInstallation of the power supply line<br \/>\nConstruction of the pump building and fencing<br \/>\nSetup of the water tank<\/p>\n<p align=\"left\"><a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station2.jpg\"><img loading=\"lazy\" class=\" size-medium wp-image-1101 aligncenter\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station2-300x225.jpg\" alt=\"wasser station2\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station2-300x225.jpg 300w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station2.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p align=\"left\"><span style=\"text-decoration: underline;\">Report of Work Done On-Site<\/span>:<\/p>\n<p align=\"left\">On Februar 13, 2010: From Salzburg, Austria, we began our trip to Ghana. Arrival in Accra, the capital city.<\/p>\n<p align=\"left\">February 14th:\u00a0Trip by car\u00a0from\u00a0Accra\u00a0to Damongo, approx. 700km<br \/>\nFebruary 15th: Work begins. Preliminary work already completed to our satisfaction.<\/p>\n<p align=\"left\"><a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station.jpg\"><img loading=\"lazy\" class=\" size-medium wp-image-1104 aligncenter\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station-300x201.jpg\" alt=\"wasser station\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station-300x201.jpg 300w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p align=\"left\">Februar 17th: First water is pumped out of the bore hole.<br \/>\nInstallation of the switch cabinets, plus two &#8222;safety night lights\u201c\u00a0with a twilght switch\u00a0on the pump building.<br \/>\nFebruary 18th: First water pumped into tank. Float switches installed for\u00a0the regulation of the water level.<\/p>\n<p align=\"left\"><a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/06\/wasser-holen.jpg\"><img loading=\"lazy\" class=\" size-medium wp-image-1112 aligncenter\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/06\/wasser-holen-300x201.jpg\" alt=\"wasser holen\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/06\/wasser-holen-300x201.jpg 300w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/06\/wasser-holen.jpg 512w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p align=\"center\">\n<p align=\"left\">February 19th: Water is pumped for the first time to the girls&#8216; school.<br \/>\nA water container is setup at the school. The installation of float switches here will allow the water supply system to run automatically.<\/p>\n<p align=\"left\">Power consumption will be monitored with a separate electric meter reader. The running time of the pump and the frequency of the pump activiation through the float switches will also be monitored.<\/p>\n<p align=\"left\">February 24th:\u00a0The first phase of this project is completed. The new water supply station is officially\u00a0presented over to the school.<\/p>\n<p align=\"center\"><strong>The St. Anne&#8217;s Senior High School now has clean drinking water.<\/strong><\/p>\n<p align=\"center\"><a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/04\/A-DSCN2663-Wasser-Schule.jpg\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-322\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/04\/A-DSCN2663-Wasser-Schule-300x225.jpg\" alt=\"A DSCN2663 Wasser Schule\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/04\/A-DSCN2663-Wasser-Schule-300x225.jpg 300w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/04\/A-DSCN2663-Wasser-Schule-1024x768.jpg 1024w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/04\/A-DSCN2663-Wasser-Schule.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p align=\"center\"><a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station1.jpg\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-1102\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station1-300x225.jpg\" alt=\"wasser station1\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station1-300x225.jpg 300w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/wasser-station1.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p align=\"left\">In the second phase of this project, a high-level tank was constructed so that running water is available for the school buildings.<\/p>\n<p align=\"left\"><a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/05\/A-P1000220-Wasser-Schule.jpg\"><img loading=\"lazy\" class=\" size-medium wp-image-1109 aligncenter\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/05\/A-P1000220-Wasser-Schule-225x300.jpg\" alt=\"A P1000220 Wasser Schule\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/05\/A-P1000220-Wasser-Schule-225x300.jpg 225w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2015\/05\/A-P1000220-Wasser-Schule.jpg 450w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p align=\"center\"><a href=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/P1030761.jpg\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-1103\" src=\"http:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/P1030761-300x201.jpg\" alt=\"P1030761\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/P1030761-300x201.jpg 300w, https:\/\/www.missionskreis.at\/wp-content\/uploads\/2014\/11\/P1030761.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><br \/>\nPlastic bottles are being filled with drinking water at the school.<\/p>\n<p align=\"center\">\n<div style=\"text-align: left;\" align=\"left\">Update 2013:\u00a0 In April 2013 we had to\u00a0exchange a\u00a0water pump due to clogging, as it was no longer\u00a0working properly.<\/div>\n<div style=\"text-align: center;\" align=\"left\">\n<strong>The\u00a0Missionskreis\u00a0sincerely thanks its sponsors: the Austrian &#8222;Dreik\u00f6nigs-Aktion&#8220;<\/strong><\/div>\n<div style=\"text-align: center;\" align=\"left\"><strong>and the township of Kuchl, Austria.<\/strong><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Water Supply for St. Anne&#8217;s Senior High School This project\u00a0was funded in part by the Austrian &#8222;Dreik\u00f6nigsAktion&#8220; and the township &#8230; <a class=\"read-more\" href=\"https:\/\/www.missionskreis.at\/?page_id=244\">Mehr lesen<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":429,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=\/wp\/v2\/pages\/244"}],"collection":[{"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=244"}],"version-history":[{"count":6,"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=\/wp\/v2\/pages\/244\/revisions"}],"predecessor-version":[{"id":1115,"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=\/wp\/v2\/pages\/244\/revisions\/1115"}],"up":[{"embeddable":true,"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=\/wp\/v2\/pages\/429"}],"wp:attachment":[{"href":"https:\/\/www.missionskreis.at\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}